The forecast was correct, Columbus had its "storm of the century" today, but the beauty of having home & office under the same roof paid off. We have a film! I was able to edit all day, taking breaks to plow the driveway (We had a 24" snow drift across the driveway - taller than the snow blower!)
So I was digging my way out of two messes - the snow and the show. I made some technical mistakes on Wednesday that I'm having to deal with - hissy sound from borrowed wireless mics I forgot to test, and a limited selection of shots because it got so late when we were shooting we forgot to get reverse angles. Also when flipping between angles, there were continuity errors everywhere (hand in lap / hand on table), but fortunately I found some b-roll material that could cover, and it looks pretty good.
The only thing the snow complicated was getting musicians over to actually do the recording. Everyone's been busy and I haven't had timing to give to Sharon. Now the timing is almost done - I still need to pull about 30 seconds to get it under the 11 minute limit. But I think it's doable.
And tonight is daylight savings time, so we lose our hour, making this the 167 hour film project.